Commanders Post at The Warpath  

Home | Forums | Donate | Shop




Go Back   Commanders Post at The Warpath > Off-Topic Discussion > Parking Lot

Parking Lot Off-topic chatter pertaining to movies, TV, music, video games, etc.


What REALLY grinds your gears?

Parking Lot


Reply
 
Thread Tools Display Modes
Old 08-06-2014, 10:49 AM   #1
mredskins
Gamebreaker
 
mredskins's Avatar
 
Join Date: Aug 2005
Posts: 13,235
Re: What REALLY grinds your gears?

Quote:
Originally Posted by over the mountain View Post
classic distracted driver by a hand held device.

by slowing down to 40 in a 65 mph zone, they dramatically reduce the dangers of driving and texting.

giant - i dont travel that 29 mile stretch of 95 often but that is they worst, slowest highway construction i have ever seen. started in 2012, they are saying it will be completed by end of 2014.

Virginia Megaprojects - I-95 HOV/HOT Lanes
Nothing has been slower then the work on 95 around White Marsh, MD. Shit has been going on since like 2007/08.
__________________
When life gives you paper jams, turn them into paper footballs!
mredskins is offline   Reply With Quote
Old 08-06-2014, 08:54 PM   #2
JoeRedskin
Contains football related knowledge
 
JoeRedskin's Avatar
 
Join Date: Mar 2004
Location: Second Star On The Right
Age: 63
Posts: 10,401
Re: What REALLY grinds your gears?

Quote:
Originally Posted by mredskins View Post
Nothing has been slower then the work on 95 around White Marsh, MD. Shit has been going on since like 2007/08.
I can tell you - with SmootSmack level of reliability - that they are still fighting legal battles on right-of-way issues associated with the project.

The work is massively complex in terms of the structures being constructed (high speed ramps and bridges subject to extremely high levels of stress from use and the elements), safety concerns during construction (trust me, it is unnerving to be standing near the constant traffic flow - think of changing a tire next on the interstate, every day, all day, for a year), and traffic engineering being done (compare it to trying to reroute two major rivers without ever stopping the flow of water).

On top of all that, given the fluidity of the traffic patterns, the level of complexity added by the nature of the location (i.e. - a confluence of major highways), redesign for unexpected issues is a constant problem even with all the expertise going into the original design.

If we didn't care (1) about seizing folks property without paying them a fair price; (2) if the bridges collapsed in 20 years; (3) if a few dozen workers being killed while it was being built; or (4) if we just completely shut down I-95/695 and Rte. 43 while the work was being done, the job could be done in about three months.

You know ... like they do in Russia.
__________________
Strap it up, hold onto the ball, and let’s go.
JoeRedskin is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off



All times are GMT -4. The time now is 09:44 AM.


Powered by vBulletin® Version 3.8.11
Copyright ©2000 - 2026, vBulletin Solutions Inc.
We have no official affiliation with the Washington Commanders or the NFL.
Page generated in 0.86842 seconds with 11 queries